12CSP016 - CAM - Sidewalk Repair and Replacement Phase IV
Project Summary
The abbreviated Summary of Work is as follows:
Sidewalk Repair and Replacement Phase IV Based on report and drawings of Frank Lam and Associates (attached), conduct repair or replacement on sidewalks which have deficiencies as existing condition. Furnish all material, labor, equipment, plant, bonds, insurance, environmental controls, and miscellaneous work necessary to provide safe sidewalks abiding by ADA guidelines at the main campus of The University of Texas at Austin.
The general Construction Budget for the project is approximately:
$169,000.00 to $192,000.00
Project Site
Main Campus (CAM)
Key Dates:
- Pre-Proposal Conference Site: FC1 2.106 large Conference Room
- Pre-Proposal Conference Date: February 14, 2012 Time: 10:30 A.M.
- Notice to Proposers Out: February 7, 2012
- Specifications and Plans Available on or about: February 9, 2012
- Envelopes #1 Date: February 28, 2012 Time: 11:30 A.M.
- Envelope #2 and # 3 and Public Response Acknowledgement Date: February 29, 2012 Time: 11:30 A.M.
(All proposal envelope openings held at FC1, Room 2.102. See map below.) - No. of Addenda: 0
PMCS Offices:
Directions to PMCS:
FC1 - Facilities Complex Building 1, 1301 E. Dean Keeton, Austin (Corner of Dean Keeton and Lafayette St.)
From the South: Take the Manor Rd. exit and continue north through the light passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the second driveway, turn right.
From the North: Take the Manor Rd exit. Turn left at Manor Rd. then left again onto the frontage road. Continue north, passing Mt. Calvary cemetery on the right. Turn right at the LBJ Library sign and stay to the left. The Facilities Complex is just across Dean Keeton. Turn left. At the 2nd driveway, turn right.